null
Bolt Go Kart Manual

Bolt Go Kart Manual

Posted by Jason Merrell on 2nd Jan 2025

GoPowerSports Bolt Go-Kart Kit

Complete Assembly Manual - Edition 1.0

Table of Contents

  1. Introduction
  2. Safety Information
  3. Tools & Requirements
  4. Parts Inventory
  5. Pre-Assembly Preparation
  6. Assembly Stages (1-8)
  7. Initial Testing
  8. Maintenance Schedule
  9. Troubleshooting Guide
  10. Support Resources
  1. Introduction

Congratulations on your purchase of the GoPowerSports Bolt Go-Kart Kit! This premium bolt-together go-kart has been engineered for both beginning and experienced builders. Your kit features:

  • 98cc (3HP) engine standard configuration
  • Speeds up to 26mph (stock)
  • Complete bolt-together design - no welding required
  • Adjustable pedal positions
  • Upgradeable to 212cc engine
  • Premium frame components

Project Requirements

  • Assembly Time: 4-6 hours
  • Workspace: 10' x 10' minimum
  • Working Surface: Level concrete floor
  • Assistance: Some steps require two people
  • Skill Level: Beginner to Intermediate

Safety Information

IMPORTANT: Read all safety instructions before beginning assembly

Required Safety Equipment:

  • Safety glasses
  • Work gloves
  • Closed-toe shoes
  • Protective clothing

Assembly Safety:

  • Keep work area clean and well-lit
  • Keep children and pets away from assembly area
  • Use proper lifting techniques for heavy components
  • Follow all torque specifications
  • Double-check all safety-critical connections

Operational Safety:

  • Minimum operator age: 13 years
  • Maximum weight capacity: 400 lbs
  • Always wear DOT-approved helmet
  • Never operate under the influence
  • Follow all local regulations
  • Maintain safe operating speeds

Required Tools

Primary Tools:

  • Torque wrench (10-50 ft-lbs range)
  • Socket set (metric and standard):
    • 13mm (primary size)
    • 9/16"
    • 13/2"
    • 10mm
    • 13/16"
    • 15/16"
    • 1-1/16"
  • Allen wrench set:
    • 4mm
    • 5mm
    • 6mm
  • Adjustable wrenches (2)
  • Phillips screwdriver
  • Flathead screwdriver

Specialty Tools:

  • Chain break tool (recommended)
  • 7/32" drill bit
  • Center punch
  • Tape measure
  • Level
  • Thread locking compound

Optional Tools:

  • Impact wrench
  • Socket extensions
  • Universal joint adapter
  • Anti-seize compound
  • Paint markers
  • Digital camera (for documentation)

Parts Inventory

Frame Components:

  • Main frame rails (2)
  • Front crossbar (1)
  • Middle crossbar (1)
  • Rear crossbar (1)
  • Front axle assembly (1)
  • Steering mount tubes (2)
  • Seat support tubes (4)
  • Armrest bars (2)

Hardware Packages:

  • Primary Hardware Kit:
    • M8x45mm bolts
    • M8 nylon lock nuts
    • Washers (flat and split)
    • 60mm specialty bolts
  • Steering Hardware Kit:
    • Tie rod ends
    • Steering shaft components
    • Steering wheel mounting hardware
  • Engine Mounting Kit:
    • Engine mount bolts
    • Chain
    • Master link
    • Clutch assembly

Pre-Assembly Preparation

  • Inventory Verification
    • Unpack all boxes carefully
    • Check parts against inventory list
    • Photograph any damaged components
    • Contact support if parts are missing
    • Sort hardware by size and type
    • Label bags for organized assembly
  • Workspace Setup
    • Clear minimum 10' x 10' area
    • Ensure proper lighting
    • Place rubber mat or cardboard for protection
    • Set up parts in assembly order
    • Position tools within easy reach
    • Prepare cleaning station
  • Frame Preparation
    • Clean all metal components with acetone/degreaser
    • Remove any manufacturing oils
    • Check all tubes for debris inside
    • Verify all pre-drilled holes are clear
    • Remove any burrs from cut edges
    • Mark left/right components if needed
  • Paint/Powder Coat (Optional)
    • Complete dry fit first
    • Mark all mating surfaces
    • Mask threaded holes
    • Sand surfaces if needed
    • Apply preferred finish
    • Allow proper curing time

Stage 1: Main Frame Assembly

  1. Frame Rail Positioning Locate main frame rails:
    • Position rails parallel on work surface
    • Verify pedal mounting holes are on TOP
    • Space rails approximately 20" apart
    • Front is end with pedal mounting holes
    • Use blocks to raise frame 2" off ground

2. Crossbar Identification Front Crossbar:

    • 5 holes in middle
    • 4 holes on sides
    • 1 hole on top

3. Middle Crossbar:

    • 4 holes on top
    • Extra hole goes on left side

4. Rear Crossbar:

    • 5 holes on top
    • Extra hole positioned left

5. Initial Bolt Placement

    • Insert M8x45mm bolts in all top holes EXCEPT:
      • Skip 4 front holes (cable mounts)
      • Skip 2 middle holes (floor pans)
    • Use 60mm bolts for rear corners
    • Leave all bolts finger-tight
    • Verify bolt heads are uniform direction

6. Bracket Installation Front Section:

    • Install 5-hole triangular brackets (4)
    • Position brackets flush against frame
    • Verify bracket orientation matches diagram

7. Middle Section:

    • Mount 4-hole triangular brackets (2)
    • Align holes precisely

8. Rear Section:

    • Position corner brackets
    • Check for proper angle alignment

9. Front Axle Mounting

    • Position spindle tops toward rear
    • Verify two mounting holes at bottom
    • Install mounting hardware loosely
    • Check for proper spacing

Stage 2: Floor Pan and Support Structure

  1. Floor Pan Preparation
    • Clean all mating surfaces
    • Check hole alignment
    • Verify pan orientation
    • Label front/rear edges

2. Installation Sequence Front Floor Pan:

    • Remove front bracket nuts
    • Position pan carefully
    • Follow under/over pattern
    • Use mallet if needed for alignment

3. Middle Floor Pan:

    • Align with front pan
    • Maintain consistent pattern
    • Verify all holes match

4. Rear Floor Pan:

    • Complete pan pattern
    • Check all seams
    • Verify proper overlap

5. Hardware Tightening

    • Start from center
    • Work outward systematically
    • Torque sequence:
      • Hand tight first
      • Snug with impact
      • Final torque 18 ft-lb
    • Apply thread locker if permanent

Stage 3: Steering Assembly

  1. Spindle Installation Preparation:
    • 1x spindle body
    • 1x nylon wheel spacer
    • 2x nylon split bushings
    • Mounting hardware
    • Verify per spindle:

2. Installation Steps:

    • Apply grease to mounting surfaces
    • Install split bushings into spindle
    • Position wheel spacer correctly
    • Verify tie rod mounting points face forward
    • Torque sequence:
      • Hand tight
      • Quarter turn with wrench
      • Final torque to 18 ft-lb
      • Check for free movement

3. Steering Shaft Assembly Components Check:

    • 1x main steering shaft
    • 2x lock collars
    • 1x short lower bracket
    • 1x tall lower bracket
    • Mounting hardware

4. Assembly Order:

    • Install bottom lock collar
    • Mount short bracket (front position)
    • Position tall bracket (rear position)
    • Install top lock collar
    • Verify shaft rotation is smooth
    • Check for binding points

5. Tie Rod Installation Preparation:

    • Lay out tie rod ends
    • Note left and right threads
    • Verify proper length adjustment range

6. Installation Steps:

    • Thread rod ends equally
    • Install in this order:
      • Bolt
      • Split washer
      • Tie rod end
      • Second split washer
      • Nylon lock nut
    • Leave slightly loose for alignment

7. Wheel Alignment Process Initial Setup:

    • Position wheels straight
    • Center steering shaft
    • Mark center position

8. Adjustment Steps:

    • Adjust tie rods equally
    • Check toe-in (1/8" recommended)
    • Verify steering range
    • Lock jam nuts firmly
    • Double-check all connections

Stage 4: Engine Mounting

  1. Engine Preparation Pre-Installation Checks:
    • Fill with 10W30 oil
    • Check all mounting points
    • Verify clutch assembly
    • Test pull-start operation

2. Clutch Installation:

    • Mount clutch cover bolts first
    • Install output shaft spacer
    • Align clutch with keyway
    • Torque clutch bolt (specific torque)
    • Attach clutch guard

3. Engine Mounting Process Position Setup:

    • Place engine on mount plate
    • Align mounting holes
    • Install mounting hardware:
      • Split washers on top
      • Flat washers below
      • Leave loose for chain adjustment

4. Drive Chain Installation Preparation:

    • Measure required length
    • Mark chain at break point
    • Verify master link orientation

5. Installation Steps:

    • Break chain to length
    • Route around sprockets
    • Install master link:
      • Clip faces away from clutch
      • Verify clip orientation
      • Check link security

6. Drive System Alignment Critical Checks:

    • Sprocket alignment
    • Chain tension (1/2" deflection)
    • Engine position
    • Clutch clearance

7. Final Steps:

    • Torque engine mounts
    • Secure chain guard
    • Check for binding
    • Verify smooth operation

Stage 5: Brake System Installation

  1. Brake Component Preparation Parts Check:
    • Brake band assembly
    • Cable and housing
    • Mounting hardware
    • Return springs
    • Adjustment components

2. Mechanical Installation Mounting Steps:

    • Position brake band
    • Install mounting bracket
    • Route cable properly
    • Attach return springs
    • Set initial adjustment

3. Cable Routing

    • Follow frame contours
    • Avoid sharp bends
    • Secure with cable ties
    • Allow for suspension movement
    • Protect from heat sources

 

Stage 6: Control Systems & Electrical

  1. Pedal Assembly Installation Position Selection:
    • Forward position (39" leg room)
    • Rear position (33" leg room)
    • Determine driver size
    • Choose mounting position:

2. Installation Steps:

    • Mount pedal brackets
    • Install pedal stops
    • Position return springs
    • Set cable attachment points
    • Verify smooth operation

3. Kill Switch Installation Wiring Process:

    • Route primary wire along frame
    • Strip wire ends properly:
      • 1/2" strip length
      • Clean copper exposure
      • No stray strands
    • Make connections:
      • Wrap stripped end clockwise
      • Secure under mounting bolt
      • Apply electrical tape
      • Test connection stability

4. Throttle Cable Setup Routing:

    • Install cable housing clamps
    • Route along frame rail
    • Maintain gentle bends
    • Secure with zip ties

5. Adjustment:

    • Set idle position
    • Verify full throttle reach
    • Check return spring tension
    • Set cable free play (1/8")

Stage 7: Seat Installation & Final Body Components

  1. Seat Mounting Preparation:
    • Position seat on frame
    • Mark mounting holes
    • Drill with 7/32" bit
    • Clean drilling debris

2. Installation:

    • Install mounting hardware
    • Add washers as needed
    • Torque to specifications
    • Check for stability

3. Safety Padding Installation Components:

    • Roll cage padding
    • Steering wheel cover
    • Frame protection points

4. Application:

    • Clean surfaces
    • Apply adhesive if required
    • Secure with zip ties
    • Trim excess material

5. Body Panel Installation Sequence:

    • Side panels
    • Front nose
    • Rear panel
    • Check all fasteners
    • Verify panel alignment

Stage 8: Final Assembly & Testing

  1. Pre-Start Checklist Mechanical Checks:
    • All bolts torqued
    • Chain tension correct
    • Wheel alignment verified
    • Brake adjustment proper
    • Steering movement free

2. Safety Systems:

    • Kill switch operation
    • Brake light function
    • All safety labels in place
    • Guards and shields secure

3. Initial Start Procedure Preparation:

    • Add fresh fuel
    • Check oil level
    • Clear area
    • Support rear wheels

4. Testing Sequence:

    • Activate kill switch
    • Check choke position
    • Start engine
    • Allow warm-up
    • Test all controls

5. Break-In Period Guidelines First Hour:

    • Vary engine speed
    • Avoid full throttle
    • Monitor temperature
    • Check for loose parts

6. Next Five Hours:

    • Gradually increase speed
    • Check adjustments
    • Monitor chain tension
    • Verify brake operation

Maintenance Schedule

  • Before Each Ride
    • Tire pressure check
    • Brake function test
    • Chain tension verification
    • Control operation check
    • Fuel level check
  • Weekly Maintenance
    • Clean air filter
    • Lubricate chain
    • Check all fasteners
    • Inspect wear points
    • Clean entire unit
  • Monthly Service
    • Change engine oil
    • Grease bearings
    • Adjust chain tension
    • Check tire wear
    • Inspect frame integrity
  • Annual Maintenance
    • Replace fuel lines
    • Change air filter
    • Check valve clearance
    • Replace spark plug
    • Inspect all bearings

Troubleshooting Guide

  • Engine Issues Won't Start:
    • Check fuel level/quality
    • Verify kill switch position
    • Examine spark plug condition
    • Confirm choke setting
    • Check air filter cleanliness
  • Poor Performance:
    • Clean carburetor
    • Check valve clearance
    • Verify timing
    • Inspect fuel filter
    • Test compression
  • Drive System Problems Chain Issues:
    • Proper tension (1/2" play)
    • Sprocket alignment
    • Master link security
    • Lubrication state
    • Wear inspection
  • Clutch Problems:
    • Engagement speed
    • Wear patterns
    • Spring tension
    • Bearing condition
    • Proper clearance
  • Steering/Handling Issues Steering Binding:
    • Spindle lubrication
    • Tie rod alignment
    • Bearing condition
    • Frame alignment
    • Tire pressure
  • Handling Problems:
    • Wheel alignment
    • Tire condition
    • Frame integrity
    • Bearing play
    • Suspension settings
  • Brake System Troubleshooting Poor Braking:
    • Cable adjustment
    • Pad condition
    • Drum surface
    • Return spring tension
    • Linkage wear

Support Resources:

  1. Community Resources Online Groups:
    • Facebook: "Bolt Kart Builders"
    • Video Tutorial
    • Email: sales@gopowersports.com

Specifications

  • Technical Data Dimensions:
    • Length: 72 inches
    • Width: 42 inches
    • Height: 48 inches
    • Weight: 165 lbs
  • Performance:
    • Top Speed (Stock): 26 mph
    • Turning Radius: 12 feet
    • Brake Distance: 25 feet
  • Torque Specifications Critical Fasteners:
    • Engine mount: 25 ft-lbs
    • Wheel nuts: 55 ft-lbs
    • Steering components: 18 ft-lbs
    • Frame bolts: 18 ft-lbs
    • Brake hardware: 15 ft-lbs
  • Fluid Capacities
    • Engine oil: 16 oz
    • Fuel tank: 0.95 gallon
    • Gear oil: 4 oz
    • Grease points: As needed

Contact Information

GoPowerSports Support:

  • Phone: 866-846-5278
  • Email: sales@gopowersports.com
  • Website: www.gopowersports.com
  • Hours: Mon-Fri 9AM-5PM CST

Maintenance Log

[Include blank maintenance log sheets for:

  • Oil changes
  • Chain adjustments
  • Brake service
  • General maintenance
  • Modification records]

This concludes the complete assembly and maintenance manual for your GoPowerSports Bolt Go-Kart Kit. Keep this manual for future reference and maintenance scheduling.

Sold out
Sold out
/* */